How the numbers are built
The site is generated from the analysis in main.ipynb. The cleaning rules live in backend/pipeline/cleaning.py and are shared by the notebook logic and the API, so the figures here match the notebook.
Data
- Planning applications: 181,929 applications across London's planning authorities, started 2022-01-01 to 2025-12-31, with decisions up to 2026-07-31. Records were last fetched from the councils on 9 August 2026, and this site's figures were rebuilt on 26 September 2026.
- Boundaries: ONS Local Authority Districts (December 2023, generalised clipped), London codes E09.
- Population: ONS mid-year estimates, 2025.
- Brownfield Land Register: current entries (no end date) with a point location and site area.
- Land use: OpenStreetMap
landusepolygons: industrial, and farmland, meadow or greenfield ("virgin / greenfield"). - Green Belt: Natural England Green Belt boundaries, clipped to London.
Scope and outcomes
Only full planning applications are included (98,310 in the 32 boroughs). Outcomes come from the dataset's normalised status: Permitted and Conditions count as approved; Rejected as refused; Withdrawn on its own; Undecided, Unresolved and Referred as undecided. Approval rate = approved ÷ (approved + refused), so withdrawn and undecided applications are excluded from the denominator. The withdrawal rate is withdrawn ÷ all full applications.
London-wide figures cover the 32 boroughs. The City of London and the two Mayoral Development Corporations are reported separately, and rankings only include authorities with at least 100 decided full applications.
Confidence intervals
Approval rates carry 95% Wilson score intervals, which behave better than the normal approximation for rates near 0 or 1 and for small samples. London's approval rate is 78.7% (78.4%–79.0%).
Decision times
- Days to decision is taken from the data. Negative values are treated as errors and dropped. Very long durations are real (appeals, S106 agreements), so they stay in, and medians are used so they don't dominate.
- Within the statutory period means decided within 56 days (8 weeks), or 91 days (13 weeks) for Large applications. Agreed extensions of time and Planning Performance Agreements are not counted, so this is stricter than official DLUHC statistics.
- Decision route collapses about 200 free-text
decided_byvalues into Committee, Delegated and Other. The route is missing for about a quarter of decisions, so the committee share is under-counted.
Gaps in decision-time data
Some boroughs' records stop giving a decision time part-way through the period. Their approval and refusal counts are complete, but their timing measures (median days, share in time, trends) only describe the applications that have a time recorded:
- Barking and Dagenham: 43% of decided applications have a decision time; the latest was for an application started in 2023-07.
- Hackney: 43% of decided applications have a decision time; the latest was for an application started in 2023-06.
- Harrow: 44% of decided applications have a decision time; the latest was for an application started in 2023-08.
- Waltham Forest: 42% of decided applications have a decision time; the latest was for an application started in 2023-06.
This matters most for Barking & Dagenham, which ranks as London's fastest borough on 2022–23 applications alone. Whether it stayed that fast for later cohorts can't be seen in this data. The notebook's section 5 figures carry the same limitation.
Trends and right-censoring
Trends group applications by the quarter they started. Recent cohorts are right-censored: slow applications that are still undecided are missing, which makes recent quarters look faster (and possibly more approving) than they will end up. Quarters with more than 10% still undecided are shaded.
Dwellings
Adding up n_dwellings naively overstates the total several times over. The count is built like this:
- Only Full and Outline applications with a dwelling count are used. This covers larger schemes only (the smallest value is 7), and householder extensions carry no count.
- Derivative submissions that repeat the parent scheme's figure are dropped: condition discharges, non-material and minor-material amendments, variations/section 73, consultation replies to neighbouring boroughs, and scoping/screening opinions.
- The remaining rows are grouped into schemes by the same dwelling count at the same location (3 decimal places, about 100 m), or by description where there are no coordinates. A scheme counts as approved if any of its applications was approved.
- Schemes are assigned to boroughs by location. This gives 634 schemes and 30,789 approved dwellings out of 99,810 proposed.
Boroughs whose portals rarely publish dwelling counts (e.g. Redbridge, Barking & Dagenham, Richmond, Waltham Forest) will look under-supplied. Some double counting can remain where an outline permission and its reserved-matters application have slightly different coordinates or numbers.
Land
- Land areas come from the dissolved polygons intersected with each borough in British National Grid, so overlapping polygons aren't double counted. "Available land" = brownfield + industrial + virgin/greenfield.
- An application counts as on brownfield if it falls within a circle of the registered site area around the register point (minimum radius 20 m, to allow for geocoding offsets). Industrial, greenfield and Green Belt flags use point-in-polygon tests. Brownfield takes priority, then industrial, then greenfield; everything else is "existing urban".
- Brownfield register updates differ by borough, and OpenStreetMap land-use coverage is uneven, so land figures are indicative.
What this can and can't tell you
- These are correlations, not causes. Borough differences can reflect the kinds of applications each borough receives (including pre-application advice and local housing types) as well as how it decides them.
- At borough level, median decision time and approval rate barely correlate (Spearman ρ = 0.17, p = 0.37).
n_commentsandn_dwellingsare sparse, and how often they're missing depends on the borough.- A few raw decision labels are noisy (e.g. "Approve No Conditions" filed under Conditions), but this doesn't affect the approved vs refused split.
Rebuilding the data
Run uv run python -m backend.pipeline.build after updating anything in data/. It rewrites backend/data/ and prints the key numbers, so you can check them against section 8 of the notebook.