London Planning AtlasCompare boroughs

Tower Hamlets

London borough26th of 32 for approval2nd fastest12th for approved homes
71.4%
Approval rate
−7.3 pts vs London · 95% CI 68%–75%
56
Median days to decision
−7 days vs London (63)
58%
Decided within the statutory period
London 38%
666
Dwellings approved
of 1,895 proposed · 2.2% of London

Approvals and refusals

637 full applications, of which 587 were decided: 419 approved and 168 refused. 0 were withdrawn (0.0%) and 47 are still undecided.

What happened to every full application

Share of all full applications, by outcome

ApprovedRefusedWithdrawnUndecided

Approval by application size

Dot = this authority; grey tick = London. Sizes with fewer than 10 decisions are hidden.

Tower HamletsLondon

Tower Hamlets among London's boroughs

Approval rate with 95% confidence interval. Click a row to switch borough.

Where applications are approved

Decided full applications in 250 m hexagons. Colour = approval rate in the hexagon. Hover for figures.

Approval rate · midpoint = London 79%
50%100%
Hexagons with only a handful of applications can swing to either extreme; check the count in the tooltip.

Decision times

Half of decided applications took 56 days or less. The middle 50% took 54–90 days and one in ten took more than 189 days.

56 / 56
Median days: approved / refused
2%
Decided at committee
London average 2% · where route is recorded
305
Median days at committee
56
Median days, delegated

How long decisions take

Share of decided applications by days to decision (2-week bins; the last bin is 365+ days).

Tower HamletsLondon

Trends by quarter the application started

Shaded quarters still have more than 10% of applications undecided, so they will shift as slower cases are decided.

Tower HamletsLondon

Wards: speed vs approval

Wards with at least 30 decisions; marker size = decisions. Grey lines = borough average (71%, 56 days). Drag to zoom, double-click to reset.

Homes

666 homes approved across 6 schemes

That is 2.0 per 1,000 residents (borough average 3.1). Only larger schemes publish a dwelling count, and repeat submissions for the same scheme are counted once.

13
Schemes proposed
1,895
Dwellings proposed
72
Median scheme size
457
Largest scheme

Where the homes are

De-duplicated Full and Outline schemes with a published dwelling count. Dot area = dwellings. Hover for the scheme.

ApprovedNot approved (refused, withdrawn or pending)

Land and population

334,240 residents (2025) on 20 km²: 16,909 people per km², against 5,799 across London.

97 ha
Brownfield register
27 sites · 26% with permission
42 ha
Industrial land (OSM)
2.1% of area
2 ha
Virgin / greenfield (OSM)
0.1% of area
0%
Green Belt share
0 ha

Available land as a share of area

Brownfield (register), industrial and greenfield (OpenStreetMap)

BrownfieldIndustrialVirgin / greenfield

Approval by the land an application sits on

Decided full applications located in this borough (includes development-corporation cases). Rates need 20+ decisions.

Land typeDecidedApprovalLondon
Existing urban57972%78%
Brownfield8–82%
Industrial8–76%
Virgin / greenfield0–52%

Land: brownfield, Green Belt and land use

Brownfield register sites sized by hectares, coloured by permission status.

PermissionedNot permissionedPending decisionOther / unknownGreen Belt

Browse 637 applications in Tower Hamlets

Filter by outcome, size, year and land type, open the council record, or export to CSV.

Search applications