Havering

London borough22nd of 32 for approval17th fastest30th for approved homes
73.2%
Approval rate
−5.5 pts vs London · 95% CI 72%–75%
64
Median days to decision
+1 days vs London (63)
26%
Decided within the statutory period
London 38%
30
Dwellings approved
of 2,407 proposed · 0.1% of London

Approvals and refusals

3,582 full applications, of which 3,393 were decided: 2,484 approved and 909 refused. 145 were withdrawn (4.0%) and 44 are still undecided.

What happened to every full application

Share of all full applications, by outcome

ApprovedRefusedWithdrawnUndecided

Approval by application size

Dot = this authority; grey tick = London. Sizes with fewer than 10 decisions are hidden.

HaveringLondon

Havering among London's boroughs

Approval rate with 95% confidence interval. Click a row to switch borough.

Where applications are approved

Decided full applications in 250 m hexagons. Colour = approval rate in the hexagon. Hover for figures.

Approval rate · midpoint = London 79%
50%100%
Hexagons with only a handful of applications can swing to either extreme; check the count in the tooltip.

Decision times

Half of decided applications took 64 days or less. The middle 50% took 56–86 days and one in ten took more than 128 days.

63 / 67.5
Median days: approved / refused
–
Decided at committee
London average 2% · where route is recorded
–
Median days at committee
–
Median days, delegated

How long decisions take

Share of decided applications by days to decision (2-week bins; the last bin is 365+ days).

HaveringLondon

Trends by quarter the application started

Shaded quarters still have more than 10% of applications undecided, so they will shift as slower cases are decided.

HaveringLondon

Wards: speed vs approval

Wards with at least 30 decisions; marker size = decisions. Grey lines = borough average (73%, 64 days). Drag to zoom, double-click to reset.

Homes

30 homes approved across 1 schemes

That is 0.1 per 1,000 residents (borough average 3.1). Only larger schemes publish a dwelling count, and repeat submissions for the same scheme are counted once.

10
Schemes proposed
2,407
Dwellings proposed
39
Median scheme size
900
Largest scheme

Where the homes are

De-duplicated Full and Outline schemes with a published dwelling count. Dot area = dwellings. Hover for the scheme.

ApprovedNot approved (refused, withdrawn or pending)

Land and population

280,787 residents (2025) on 112 km²: 2,500 people per km², against 5,799 across London.

104 ha
Brownfield register
106 sites · 67% with permission
331 ha
Industrial land (OSM)
2.9% of area
2,518 ha
Virgin / greenfield (OSM)
22.4% of area
54%
Green Belt share
6,063 ha

Available land as a share of area

Brownfield (register), industrial and greenfield (OpenStreetMap)

BrownfieldIndustrialVirgin / greenfield

Approval by the land an application sits on

Decided full applications located in this borough (includes development-corporation cases). Rates need 20+ decisions.

Land typeDecidedApprovalLondon
Existing urban3,32973%78%
Brownfield18–82%
Industrial18–76%
Virgin / greenfield13–52%

Land: brownfield, Green Belt and land use

Brownfield register sites sized by hectares, coloured by permission status.

PermissionedNot permissionedPending decisionOther / unknownGreen Belt

Browse 3,582 applications in Havering