London Planning AtlasCompare boroughs

Harrow

London borough24th of 32 for approval13th fastest18th for approved homes
72.5%
Approval rate
−6.2 pts vs London · 95% CI 71%–74%
63
Median days to decision
+0 days vs London (63) · data only to 2023-08
42%
Decided within the statutory period
London 38%
322
Dwellings approved
of 5,654 proposed · 1.0% of London

Approvals and refusals

3,120 full applications, of which 2,694 were decided: 1,954 approved and 740 refused. 174 were withdrawn (5.6%) and 1 are still undecided.

What happened to every full application

Share of all full applications, by outcome

ApprovedRefusedWithdrawnUndecided

Approval by application size

Dot = this authority; grey tick = London. Sizes with fewer than 10 decisions are hidden.

HarrowLondon

Harrow among London's boroughs

Approval rate with 95% confidence interval. Click a row to switch borough.

Where applications are approved

Decided full applications in 250 m hexagons. Colour = approval rate in the hexagon. Hover for figures.

Approval rate · midpoint = London 79%
50%100%
Hexagons with only a handful of applications can swing to either extreme; check the count in the tooltip.

Decision times

Half of decided applications took 63 days or less. The middle 50% took 56–91 days and one in ten took more than 146 days.

Harrow's records stop giving decision times for applications started after 2023-08. Only 44% of decided applications have one, so the timing figures here describe the earlier applications and aren't directly comparable with other boroughs.

63 / 60
Median days: approved / refused
2%
Decided at committee
London average 2% · where route is recorded
118
Median days at committee
62
Median days, delegated

How long decisions take

Share of decided applications by days to decision (2-week bins; the last bin is 365+ days).

HarrowLondon

Trends by quarter the application started

Shaded quarters still have more than 10% of applications undecided, so they will shift as slower cases are decided.

HarrowLondon

Wards: speed vs approval

Wards with at least 30 decisions; marker size = decisions. Grey lines = borough average (73%, 63 days). Drag to zoom, double-click to reset.

Homes

322 homes approved across 7 schemes

That is 1.2 per 1,000 residents (borough average 3.1). Only larger schemes publish a dwelling count, and repeat submissions for the same scheme are counted once.

21
Schemes proposed
5,654
Dwellings proposed
33
Median scheme size
3,365
Largest scheme

Where the homes are

De-duplicated Full and Outline schemes with a published dwelling count. Dot area = dwellings. Hover for the scheme.

ApprovedNot approved (refused, withdrawn or pending)

Land and population

272,612 residents (2025) on 50 km²: 5,400 people per km², against 5,799 across London.

102 ha
Brownfield register
102 sites · 82% with permission
35 ha
Industrial land (OSM)
0.7% of area
339 ha
Virgin / greenfield (OSM)
6.7% of area
22%
Green Belt share
1,089 ha

Available land as a share of area

Brownfield (register), industrial and greenfield (OpenStreetMap)

BrownfieldIndustrialVirgin / greenfield

Approval by the land an application sits on

Decided full applications located in this borough (includes development-corporation cases). Rates need 20+ decisions.

Land typeDecidedApprovalLondon
Existing urban2,65273%78%
Brownfield2060%82%
Industrial4–76%
Virgin / greenfield2–52%

Land: brownfield, Green Belt and land use

Brownfield register sites sized by hectares, coloured by permission status.

PermissionedNot permissionedPending decisionOther / unknownGreen Belt

Browse 3,120 applications in Harrow

Filter by outcome, size, year and land type, open the council record, or export to CSV.

Search applications