Hackney
Approvals and refusals
1,689 full applications, of which 1,401 were decided: 1,080 approved and 321 refused. 56 were withdrawn (3.3%) and 146 are still undecided.
What happened to every full application
Share of all full applications, by outcome
Approval by application size
Dot = this authority; grey tick = London. Sizes with fewer than 10 decisions are hidden.
Hackney among London's boroughs
Approval rate with 95% confidence interval. Click a row to switch borough.
Where applications are approved
Decided full applications in 250 m hexagons. Colour = approval rate in the hexagon. Hover for figures.
Decision times
Half of decided applications took 63 days or less. The middle 50% took 56–91 days and one in ten took more than 134 days.
Hackney's records stop giving decision times for applications started after 2023-06. Only 43% of decided applications have one, so the timing figures here describe the earlier applications and aren't directly comparable with other boroughs.
How long decisions take
Share of decided applications by days to decision (2-week bins; the last bin is 365+ days).
Trends by quarter the application started
Shaded quarters still have more than 10% of applications undecided, so they will shift as slower cases are decided.
Wards: speed vs approval
Wards with at least 30 decisions; marker size = decisions. Grey lines = borough average (77%, 63 days). Drag to zoom, double-click to reset.
669 homes approved across 6 schemes
That is 2.5 per 1,000 residents (borough average 3.1). Only larger schemes publish a dwelling count, and repeat submissions for the same scheme are counted once.
Where the homes are
De-duplicated Full and Outline schemes with a published dwelling count. Dot area = dwellings. Hover for the scheme.
Land and population
266,241 residents (2025) on 19 km²: 13,978 people per km², against 5,799 across London.
Available land as a share of area
Brownfield (register), industrial and greenfield (OpenStreetMap)
Approval by the land an application sits on
Decided full applications located in this borough (includes development-corporation cases). Rates need 20+ decisions.
| Land type | Decided | Approval | London |
|---|---|---|---|
| Existing urban | 1,400 | 77% | 78% |
| Brownfield | 1 | – | 82% |
| Industrial | 5 | – | 76% |
| Virgin / greenfield | 0 | – | 52% |
Land: brownfield, Green Belt and land use
Brownfield register sites sized by hectares, coloured by permission status.
Browse 1,689 applications in Hackney
Filter by outcome, size, year and land type, open the council record, or export to CSV.