London Planning AtlasCompare boroughs

Brent

London borough28th of 32 for approval17th fastest27th for approved homes
70.0%
Approval rate
−8.7 pts vs London · 95% CI 68%–71%
64
Median days to decision
+1 days vs London (63)
32%
Decided within the statutory period
London 38%
89
Dwellings approved
of 913 proposed · 0.3% of London

Approvals and refusals

3,959 full applications, of which 3,802 were decided: 2,660 approved and 1,142 refused. 107 were withdrawn (2.7%) and 47 are still undecided.

What happened to every full application

Share of all full applications, by outcome

ApprovedRefusedWithdrawnUndecided

Approval by application size

Dot = this authority; grey tick = London. Sizes with fewer than 10 decisions are hidden.

BrentLondon

Brent among London's boroughs

Approval rate with 95% confidence interval. Click a row to switch borough.

Where applications are approved

Decided full applications in 250 m hexagons. Colour = approval rate in the hexagon. Hover for figures.

Approval rate · midpoint = London 79%
50%100%
Hexagons with only a handful of applications can swing to either extreme; check the count in the tooltip.

Decision times

Half of decided applications took 64 days or less. The middle 50% took 56–82 days and one in ten took more than 115 days.

64 / 64
Median days: approved / refused
1%
Decided at committee
London average 2% · where route is recorded
186
Median days at committee
64
Median days, delegated

How long decisions take

Share of decided applications by days to decision (2-week bins; the last bin is 365+ days).

BrentLondon

Trends by quarter the application started

Shaded quarters still have more than 10% of applications undecided, so they will shift as slower cases are decided.

BrentLondon

Wards: speed vs approval

Wards with at least 30 decisions; marker size = decisions. Grey lines = borough average (70%, 64 days). Drag to zoom, double-click to reset.

Homes

89 homes approved across 3 schemes

That is 0.3 per 1,000 residents (borough average 3.1). Only larger schemes publish a dwelling count, and repeat submissions for the same scheme are counted once.

10
Schemes proposed
913
Dwellings proposed
27
Median scheme size
464
Largest scheme

Where the homes are

De-duplicated Full and Outline schemes with a published dwelling count. Dot area = dwellings. Hover for the scheme.

ApprovedNot approved (refused, withdrawn or pending)

Land and population

352,201 residents (2025) on 43 km²: 8,148 people per km², against 5,799 across London.

227 ha
Brownfield register
200 sites · 45% with permission
289 ha
Industrial land (OSM)
6.7% of area
7 ha
Virgin / greenfield (OSM)
0.2% of area
0%
Green Belt share
0 ha

Available land as a share of area

Brownfield (register), industrial and greenfield (OpenStreetMap)

BrownfieldIndustrialVirgin / greenfield

Approval by the land an application sits on

Decided full applications located in this borough (includes development-corporation cases). Rates need 20+ decisions.

Land typeDecidedApprovalLondon
Existing urban3,70270%78%
Brownfield5167%82%
Industrial14–76%
Virgin / greenfield0–52%

Land: brownfield, Green Belt and land use

Brownfield register sites sized by hectares, coloured by permission status.

PermissionedNot permissionedPending decisionOther / unknownGreen Belt

Browse 3,959 applications in Brent

Filter by outcome, size, year and land type, open the council record, or export to CSV.

Search applications